• Name :Frequently Asked Questions and Solutions to crushing Material of Construction Waste Crusher
  • Abstract:

    Abstract:The Construction Waste Crusher is an early crushing device because it is simple, rugged, reliable, easy to maintain and trim. Although the Construction Waste Crusher is commonly used in crushing equipment failure rate is relatively low equipment, but it will also be used in the process of two common problems, such as why Construction Waste Crusher output does not meet the factory standard? Why do you have beating and percussion when you work with a fixed jaw? Construction Waste Crusher main sheave, moving jaw normal, but crushing work stopped? Why Construction Waste Crusher production can not break the factory standard? Here we take two look at the causes of these common faults and solutions to it.

Introduction

The Construction Waste Crusher is an early crushing device because it is simple in construction, rugged, reliable, easy to maintain and trim, and the production and construction costs are lower, so until now, in metallurgy, chemicals, building materials, electricity, transportation And other industrial sectors, in the crushing of the compressive strength of 147 ~ 245 MPa of various minerals and rocks of coarse, medium and fine crushing. Construction Waste Crusher is divided into two kinds of pendulum and simple pendulum two, mainly for coarse, crushing In recent years, it has been used to crush a variety of high-strength materials, the application is very extensive.

Application:

Construction Waste Crusher crushing ratio, product size uniformity, simple structure, reliable, easy maintenance, low operating costs. Its work, the motor through the pulley to drive the eccentric shaft rotation, move the jaw trail closed, leaving the jaw, so that the material has squeeze, friction, grinding and other multiple crushing, so that the material from large to small, gradually down until discharged discharge.

The main reasons for the failure may occur: 1, the bearing temperature is too high, grease is insufficient, grease stains, bearing damage, add the right amount of grease, replace the grease after washing the bearings, replace the bearings, spring break, adjust the mouth of the small displacement, Loosen the spring.

Remedy: Discharge the mouth of the second relaxation spring, adjust the appropriate tightening lever nut, the machine through the percussion, the appropriate tightening lever nut. Second, the flywheel continues to run, and the crushing work stops, the elbow falls off the groove, the spring breaks, the rod breaks, the lever nut loosens, the replacement spring, the replacement lever, the replacement nut, the movable jaw beating, the jaw plate fastener , Jaw plate fastening, fixed jaw plate beating, jaw fastener relaxation, jaw plate fastener relaxation and so on.

Construction Waste Crusher operation will appear in the process of what: Construction Waste Crusher host suddenly shut down (commonly known as: boring car). Why the Construction Waste Crusher output does not meet the factory standard? Why do you have beating and percussion when you work with a fixed jaw? Construction Waste Crusher main sheave, moving jaw normal, but crushing work stopped?

How to solve the Construction Waste Crusher in the course of the operation: Why Construction Waste Crusher production can not break the factory standard?

Method of exclusion:

  • 1 replace or increase the crusher;
  • 2 switch motor wiring;
  • 3 discharge port is adjusted to nominal discharge outlet and used for the increase of crusher;
  • 4 Check the pitch size, such as the replacement of the jaw plate, the relative position of the jaw plate and the moving jaw plate, to ensure that the tooth to the tooth root, fixed pressure, to prevent displacement;
  • 5, adjust the workplace voltage, to adapt to the mainframe overload requirements;
  • 6 Replace the bearing or move the jaw.

Why do you have beating and percussion when you work with a fixed jaw?

Exclude:

  • 1 fastening or aligning bolts;
  • 2 adjust the discharge port, to ensure the correct gap between the two jaws.

Construction Waste Crusher main sheave, moving jaw normal, but crushing work stopped?

Exclude:

  • 1 Replace the tension spring;
  • 2 replace the lever;
  • 3 Reinstall or replace the brackets.

Construction Waste Crusher host sudden shutdown (commonly known as: boring car)

Method of exclusion:

  • 1 unload unloading outlet blockage to ensure the smooth flow of materials;
  • 2 tighten or replace the V-belt;
  • 3 reinstall or replace the fastening bushing;
  • 4 to adjust the workplace voltage to meet the requirements of the host operating voltage;
  • 5 Replace the bearing.